Infrastructure


Mighty River Power

Mighty River Power

Mighty River Power (now Mercury Energy) engaged Galbraith Engineering Limited to install 14 turbine fire pump assemblies and control systems for their Waikato power stations.

Galbraith Engineering Limited supplied and installed 14 turbine fire pump assemblies and control systems for the Waikato power station network.


Lyttelton Tunnel

Lyttelton Tunnel

McConnell Dowell engaged Galbraith Engineering Limited to supply and install deluge pumps for the new firefighting deluge system in the Lyttelton Tunnel.

Galbraith Engineering Limited built, installed and commissioned 2 diesel fire-fighting pumps. These provide the deluge system with 10 litres of water per square metre per minute from 2,460 nozzles. This is designed to contain a fire until Fire and Emergency NZ can arrive.


Christchurch Anchor Projects

Christchurch Anchor Projects

Acute Services Building at Christchurch Hospital, and Justice Precinct.

Firewater delivered 2 diesel and 1 electric pump systems with related equipment in the Acute services building, and a diesel and electric pump system in the Justice Precinct building also with related equipment.